The pad is ready for further work. December 10, 2009
Despite a wet winter, the footings are poured.
January 12, 2010.
The first floor of the mezannine is poured and the walls are being constructed. April 5, 2010
A timber brace frame constructed from paralam replaces traditional steel supports. July 6, 2010.
The timber brace frame is extended the full length of the lab. July 7, 2010.
The monoply roof is installed rapidly and can be transformed into a green roof later on. July 19, 2010.
Polycarbonate panels are placed in a track system.
With the siding complete, the skylights and roof are intstalled.